Buro Happold Churchgate House – Office Fit Out

Buro Happold Engineers, manchester

Ninepointeight Construction have worked with Buro Happold engineers on various projects in their Manchester offices offering a design and build service on their office fit out and maintenance.

Ninepointeight construction have created and installed a video conferencing suite including fitting of the video, projector and conferencing equipment, this work was done out of hours to prevent disturbance to their busy Manchester office.
We have carried out fit out works within their original Manchester office and dealt with ongoing installations and maintenance issue.
During their recent office move to the cube in Manchester we were delighted to carry out the dilapidation works to their old office and then the fit out and installations works to their new office which included construction of a new toilet block and IT suite, supply and installation of air conditioning, creation of a board room with glazed trusses and walls and the containment and installation of cat 5 cabling throughout the office.

Buro Happold have continued to use our services because of our reliability, open pricing structure and ability to provide a one stop shop for all their building requirements with minimum disruption to their business.

  • Client – Buro Happold Consulting Engineers
  • Location – Manchester
  • Sector – Commercial

Swiftray Theme Powered by  WordPress